Our community consultations run across a wide range of topics, and we welcome your input into the work that we do. Engage with us and have your say on our projects that are currently open for consultation.
Latest news
AER publishes draft decision on Roma North (Mimas) Gas Pipeline classification
Have your say on the AER’s draft decision to classify the Roma North (Mimas) Gas Pipeline as a transmission pipeline by 3 February 2026.
Type
Communications
AER publishes review of AEMO’s Draft 2026 ISP
The Australian Energy Regulator has conducted a transparency review of the Australian Energy Market Operator’s (2025) Draft 2026 Integrated System Plan.
Type
Communications
AER publishes determination on Meeting system strength requirements in NSW RIT-T dispute
The AER has made a determination on the dispute raised by the Centre for Independent Studies of Transgrid's Meeting system strength requirements in NSW PACR.
Type
Communications
Open Consultations
Energex - Cost pass through application – Tropical Cyclone Alfred
Energex submitted a cost pass through application to recover costs incurred due to Tropical Cyclone Alfred in March 2025. Submissions close 23 January 2026.
Type
Cost pass throughs
Status
Open
Jemena – Cost pass through applications – MITE, ASMD, VEBM2
Jemena submitted applications to recover costs incurred due to various regulatory and service standard change events. Submissions close 23 January 2026.
Type
Cost pass throughs
Status
Open
Looking for something specific?
Find it here.
Quick links for consumers
Learn more about how to navigate the energy market as a consumer, including price comparison services and knowing your rights.