Use the search bar to do a keyword search on an open consultation.
Results
7 result(s), displaying 1 to 7
Rate of Return Instrument 2026
The Rate of Return Instrument specifies how the AER will determine the allowed rate of return on capital invested in regulated electricity and gas networks.
Type
Guidelines
Status
Open
2027 review of the customer export curtailment value methodology
The AER is undertaking the required review of the customer export curtailment value methodology for completion by June 2027.
Type
Reviews
Status
Open
Energex - Determination 2025–30
Energex electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Current
Ergon Energy - Determination 2025–30
Ergon Energy electricity revenue determination for the 2025–30 period
Type
Determinations
Status
Current
Review of the Ring-fencing guideline (electricity distribution) and Shared Asset Guideline
The Australian Energy Regulator (AER) has commenced a review of the Ring-fencing Guideline (electricity distribution) v4 and the Shared Asset Guideline v2.
Type
Ring-fencing
Status
Current
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2027–32
Gas access arrangement for Roma (Wallumbilla) to Brisbane Pipeline for the 2027–32 regulatory period
Type
Access arrangements
Status
Open
AusNet Services Transmission - Determination 2027-32
On 31 October 2025, AusNet Services submitted its transmission revenue proposal to the AER for the 2027–32 regulatory period.
Type
Determinations
Status
Open