Results
24 result(s), displaying 1 to 12
TransGrid - Expanding NSW-QLD Transmission Transfer Capacity regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Current
ElectraNet - SA Energy Transformation regulatory investment test for transmission (RIT-T)
Type
Contingent projects
Status
Current
Australian Gas Networks (Victoria and Albury) - Annual tariff variation 2020
Type
Tariff variations
Status
Historical
Jemena Gas Networks (NSW) - Annual tariff variation 2019-20
Type
Pricing proposals
Status
Historical
TransGrid - Cost allocation method 2017
Transgrid's Cost Allocation Method (2017) was superceeded in May 2023.
Type
Cost allocation methods
Status
Historical
Australian Gas Networks (Albury) - Annual tariff variation 2017
Type
Tariff variations
Status
Historical
Jemena Gas Networks - Cost pass through - unpaid distribution charges
Type
Cost pass throughs
Status
Current