Results
12 result(s), displaying 1 to 12
TransGrid - Cost allocation method 2017
Transgrid's Cost Allocation Method (2017) was superceeded in May 2023.
Type
Cost allocation methods
Status
Historical
Australian Gas Networks (Albury) - Annual tariff variation 2017
Type
Tariff variations
Status
Historical
Jemena Gas Networks (NSW) - Annual tariff variation 2016-17
Type
Tariff variations
Status
Historical
Central Ranges Gas Network (distribution) - Annual tariff variation 2016-17
Type
Tariff variations
Status
Historical
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2016-17
Type
Tariff variations
Status
Historical
Australian Gas Networks (Victoria and Albury) - Access Arrangement 2018-22
AGN's gas distribution access arrangement for the Victoria and Albury networks for the period 1 January 2018 to 31 December 2022
Type
Access arrangements
Status
Historical
Ausgrid - Determination 2019-24
On 30 April 2019, the AER published its final decision on the electricity determination for NSW distribution network service provider, Ausgrid, for the 2019-24
Type
Determinations
Status
Historical
Essential Energy - Determination 2019-24
On 30 April 2019, the AER published its final decision on the electricity determination for NSW distribution network service provider, Essential Energy, for the
Type
Determinations
Status
Historical
Endeavour Energy - Determination 2019-24
On 30 April 2019, the AER published its final decision on the electricity determination for NSW distribution network service provider, Endeavour Energy, for the
Type
Determinations
Status
Historical