Results
7 result(s), displaying 1 to 7
NSW Electricity Infrastructure Roadmap - contribution determination 2025−26
View our decision on the maximum amount electricity distributors can pass through to consumers in 2025-26 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
AusNet Services – Cost Pass Through – Easement Land Tax 2025-26
The AER has approved AusNet Services' application for a positive pass through of easement land tax to be recovered in 2025-26.
Type
Cost pass throughs
Status
Current
Transgrid - Determination 2023–28
Transgrid's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2022–27
Type
Access arrangements
Status
Current
APA Victorian Transmission System - Access arrangement 2023–27
Gas access arrangement for APA Victorian Transmission System for the 2023–27 regulatory period
Type
Access arrangements
Status
Current
Ausgrid Increased Customer Demand Requirements in the Macquarie Park Area Contingent Project
Ausgrid’s contingent project application requesting a revenue increase to fund its Wallumatta substation.
Type
Contingent projects
Status
Open
TasNetworks distribution cost pass through application – August-September 2024 storm
TasNetwork’s (distribution) September 2024 storm cost pass through application
Type
Cost pass throughs
Status
Open