Results
6 result(s), displaying 1 to 6
TransGrid – Expanding Victoria-New South Wales transmission transfer capacity contingent project
Type
Contingent projects
Status
Open
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
AusNet Services – Cost pass through – 500kV Transmission Line Tower Collapse
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - Annual tariff variation 2021
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - Easement land tax 2020–21
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - Access arrangement 2023–27
Type
Access arrangements
Status
Current