Results
18 result(s), displaying 1 to 12
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current
SA Power Networks - 2024–25 pricing proposal
SA Power Networks proposed new network prices to apply to its South Australian network for 2024–25.
Type
Pricing proposals
Status
Current
Australian Gas Networks (SA) - 2024–25 tariff variation notice
AGN proposed new network prices to apply to its SA gas network for 2024–25.
Type
Tariff variations
Status
Current
SA Power Networks - Cost pass through - Emergency standards 2021–22
Type
Cost pass throughs
Status
Current
Reliability and Emergency Reserve Trader (RERT) via voltage management - Ring-fencing class waiver - December 2022
A ring-fencing class waiver for RERT services.
Type
Ring-fencing
Status
Current
SA Power Networks - Annual pricing 2022–23
SA Power Networks submitted to the AER an annual pricing proposal for its South Australian distribution network for the period 1 July 2022 to 30 June 2023.
Type
Pricing proposals
Status
Historical
Australian Gas Networks (SA) - Annual tariff variation 2022–23
Australian Gas Networks submitted to the AER an annual tariff variation for its SA gas distribution network for the period 1 July 2022 to 30 June 2023
Type
Tariff variations
Status
Historical