Results
3 result(s), displaying 1 to 3
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current
Australian Gas Networks (SA) - 2025–26 tariff variation notice
AGN has proposed new network prices to apply to its SA gas network for 2025-26.
Type
Tariff variations
Status
Open