Results
11 result(s), displaying 1 to 11
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
TransGrid and ElectraNet – Project EnergyConnect contingent project
Type
Contingent projects
Status
Current
Australian Gas Networks (SA) - Annual tariff variation 2017-18
Type
Tariff variations
Status
Historical
Kangaroo Island Submarine Cable RIT-D dispute
On 17 May 2017 the AER published a determination clause 5.17.5 of the National Energy Rules.
Type
RIT-T and RIT-D disputes
Status
Historical