Sydney CBD RIT-D dispute
On 25 October 2018 the AER published a determination clause 5.17.5 of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Jemena Gas Networks (NSW) - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical
Central Ranges Gas Network (distribution) - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical
Australian Gas Networks (Albury) - Annual tariff variation 2018
Type
Tariff variations
Status
Historical
Hunter Central Coast Renewable Energy Zone Network Infrastructure Project (non-contestable)
Read Ausgrid’s proposal for the Hunter Central Coast REZ Network Infrastructure Project
Type
Determinations
Status
Open
Ausgrid’s distribution cost pass through application – January 2025 storm
Ausgrid submitted a cost pass through application to recover costs incurred due to a severe storm event from 15–17 January 2025. Submissions close 18 July 2025.
Type
Cost pass throughs
Status
Open