Results
33 result(s), displaying 13 to 24
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
CitiPower, Powercor, United Energy - Cost Allocation Method 2020
Type
Cost allocation methods
Status
Current
Endeavour Energy - Cost pass through for the 2019–20 bushfire natural disaster
On 31 August 2020, Endeavour Energy submitted a cost pass through application seeking to recover costs in relation to the 2019-20 bushfires.
Type
Cost pass throughs
Status
Current