NSW Electricity Infrastructure Roadmap - contribution determination 2024−25
View our decision on the maximum amount electricity distributors can pass through to consumers in 2024-25 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Essential Energy - Ring-fencing waiver - training services
Essential Energy submitted a ring-fencing waiver application under clause 5.2 of the Electricity Distribution Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
Transgrid - Ring-fencing waiver (backup generation) - January 2024
Transgrid submitted a ring-fencing waiver application under clause 5.2 of the Electricity Transmission Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
APA Victorian Transmission System - Annual tariff variation 2024
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2024 - 31 December 2024.
Type
Tariff variations
Status
Current
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current
AusNet Services - Cost pass through - February 2024 storm
AusNet's cost pass through application relates to distribution network costs incurred during Victoria's February 2024 storm.
Type
Cost pass throughs
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2025−26
View our decision on the maximum amount electricity distributors can pass through to consumers in 2025-26 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current