Results
67 result(s), displaying 1 to 12
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2025−26
View our decision on the maximum amount electricity distributors can pass through to consumers in 2025-26 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Energex cost pass through application – South East Queensland storms
AER has made a determination on Energex’s South East Queensland storms cost pass through application.
Type
Cost pass throughs
Status
Current
Ergon Energy Cyclone Jasper cost pass through application
AER has made a determination on Ergon Energy's cost pass through application for Cyclone Jasper.
Type
Cost pass throughs
Status
Current
Ergon Energy Cyclone Kirrily cost pass through application
AER has made a determination on Ergon Energy's cost pass through application for Cyclone Kirrily.
Type
Cost pass throughs
Status
Current
Essential Energy Bushfire Risk Reclassification Contingent Project
The AER's decision relating to Essential Energy's Bushfire Risk Reclassification Contingent Project
Type
Contingent projects
Status
Current
Energex - Determination 2025–30
Energex electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Open
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
Jemena Gas Networks (NSW) - Access arrangement 2020-25
On 5 June 2020, we published our final decision on the JGN access arrangement for the 2020-25 period.
Type
Access arrangements
Status
Current
Transgrid - Determination 2023–28
Transgrid's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current