Results
51 result(s), displaying 1 to 12
NSW Electricity Infrastructure Roadmap - contribution determination 2025−26
View our decision on the maximum amount electricity distributors can pass through to consumers in 2025-26 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Essential Energy Bushfire Risk Reclassification Contingent Project
The AER's decision relating to Essential Energy's Bushfire Risk Reclassification Contingent Project
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
Jemena Gas Networks (NSW) - Access arrangement 2020-25
On 5 June 2020, we published our final decision on the JGN access arrangement for the 2020-25 period.
Type
Access arrangements
Status
Current
Transgrid - Determination 2023–28
Transgrid's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
Australian Gas Networks (Victoria and Albury) - Access arrangement 2023–28
On 2 June 2023, we released our final decision on AGN’s access arrangement review for the 2023–28 period.
Type
Access arrangements
Status
Current
Jemena Gas Networks (NSW) - Access arrangement 2015-20 - Remittal
Type
Access arrangements
Status
Historical
Australian Gas Networks (Victoria and Albury) - Access Arrangement 2018-22
AGN's gas distribution access arrangement for the Victoria and Albury networks for the period 1 January 2018 to 31 December 2022
Type
Access arrangements
Status
Historical
TransGrid - Determination 2018-23
Transgrid's electricity transmission determination for the period 1 July 2018 to 30 June 2023
Type
Determinations
Status
Historical