Results
16 result(s), displaying 1 to 12
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
Transgrid - Determination 2023–28
Transgrid's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
TransGrid - Determination 2018-23
Transgrid's electricity transmission determination for the period 1 July 2018 to 30 June 2023
Type
Determinations
Status
Historical
Snowy Mountains Hydro Electric Authority - Determination 1999 - 2004
Type
Determinations
Status
Historical