Results
48 result(s), displaying 1 to 12
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current
Energex cost pass through application – South East Queensland storms
AER has made a determination on Energex’s South East Queensland storms cost pass through application.
Type
Cost pass throughs
Status
Current
Ergon Energy Cyclone Jasper cost pass through application
AER has made a determination on Ergon Energy's cost pass through application for Cyclone Jasper.
Type
Cost pass throughs
Status
Current
Ergon Energy Cyclone Kirrily cost pass through application
AER has made a determination on Ergon Energy's cost pass through application for Cyclone Kirrily.
Type
Cost pass throughs
Status
Current
Energex - Determination 2025–30
Energex electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Open
Murraylink - Determination 2023–28
Murraylink's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
ElectraNet - Determination 2023–28
ElectraNet's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
SA Power Networks - Determination 2020-25
SA Power Networks - Determination 2020-25
Type
Determinations
Status
Current