Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2017-22
Type
Access arrangements
Status
Historical
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2022–27
Type
Access arrangements
Status
Current
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2012-17
Type
Access arrangements
Status
Historical
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2006-11
Type
Access arrangements
Status