Results
451 result(s), displaying 205 to 216
Powercor - Contingent project - installation of Rapid Earth Fault Current Limiters - tranche 1
Type
Contingent projects
Status
Current
AusNet Services - Contingent project - installation of Rapid Earth Fault Current Limiters - tranche 1
Type
Contingent projects
Status
Current
Jemena Gas Networks (NSW) - Annual tariff variation 2017-18
Type
Tariff variations
Status
Historical
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2017-18
Type
Tariff variations
Status
Historical
Central Ranges Gas Network (distribution) - Annual tariff variation 2017-18
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - easement land tax 2017-18
Type
Cost pass throughs
Status
Historical
TransGrid - Cost allocation method 2017
Transgrid's Cost Allocation Method (2017) was superceeded in May 2023.
Type
Cost allocation methods
Status
Historical