Main Central-West Orana Renewable Energy Zone network project (contestable)
Read our determination on the amounts to be paid to ACEREZ for the main Central-West Orana REZ network project.
Type
Determinations
Status
Open
Transgrid HumeLink contingent project stage 2
Transgrid HumeLink contingent project stage 2
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
Evoenergy - 2024–25 tariff variation notice
Evoenergy proposed new network prices to apply to its ACT gas network for 2024–25.
Type
Tariff variations
Status
Current
Jemena Gas Networks - 2024–25 tariff variation notice
Jemena proposed new network prices to apply to its NSW gas network for 2024–25.
Type
Tariff variations
Status
Current
Ausgrid – 2024–25 pricing proposal
Ausgrid proposed new network prices to apply to its electricity distribution network network for 2024–25.
Type
Pricing proposals
Status
Current
Endeavour Energy – 2024–25 pricing proposal
Endeavour Energy proposed new network prices to apply to its New South Wales electricity distribution network for 2024–25.
Type
Pricing proposals
Status
Current
Essential Energy – 2024–25 pricing proposal
Essential Energy proposed new network prices to apply to its New South Wales electricity distribution network for 2024–25.
Type
Pricing proposals
Status
Current
Evoenergy – 2024–25 pricing proposal
Evoenergy proposed new network prices to apply to its ACT electricity distribution network for 2024–25.
Type
Pricing proposals
Status
Current
Transgrid VNI West contingent project application stage 1 early works
Transgrid Victoria to NSW Interconnector West (VNI West) contingent project application stage 1 early works
Type
Contingent projects
Status
Current