Results
16 result(s), displaying 1 to 12
Ausgrid - 2025–26 pricing proposal
Ausgrid proposed new network prices to apply to its New South Wales network for 2025–26.
Type
Pricing proposals
Status
Open
Endeavour Energy - 2025–26 pricing proposal
Endeavour Energy proposed new network prices to apply to its New South Wales network for 2025–26.
Type
Pricing proposals
Status
Open
Essential Energy - 2025–26 pricing proposal
Essential Energy proposed new network prices to apply to its New South Wales and southern regional Queensland network for 2025–26.
Type
Pricing proposals
Status
Open
Essential Energy - Ring-fencing waiver - training services
Essential Energy submitted a ring-fencing waiver application under clause 5.2 of the Electricity Distribution Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
Transgrid - Ring-fencing waiver (backup generation) - January 2024
Transgrid submitted a ring-fencing waiver application under clause 5.2 of the Electricity Transmission Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
Central-West Orana - Renewable Energy Zone - Ring-fencing class waiver
A class waiver under the electricity distribution Ring-fencing Guideline enables DNSPs to potentially build and operate transmission infrastructure in a REZ.
Type
Ring-fencing
Status
Open
TransGrid – Expanding Victoria-New South Wales transmission transfer capacity contingent project
Type
Contingent projects
Status
Open
New South Wales: December 2026 - March 2027
The Retailer Reliability Obligation (RRO) is designed to support reliability in the National Electricity Market (NEM).
Type
Retail Reliability Obligation
Status
Open
Essential Energy - Ring-fencing waiver - technical training
Essential Energy has submitted an application for a waiver of clause 4.2 of the Ring-fencing Guideline (Electricity distribution).
Type
Ring-fencing
Status
Open
Ergon Energy - Ring-fencing Waiver - Isolated Networks - March 2025
The Australian Energy Regulator (AER) is seeking submissions on Ergon Energy’s application to renew its waiver
Type
Ring-fencing
Status
Open
Directlink - Determination 2025–30
Directlink electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Open