Results
113 result(s), displaying 1 to 12
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
AusNet Services transmission cost pass through - 13 February 2024 storm
AusNet Services submitted a cost pass through application seeking to recover the costs it has incurred as a result of the 13 February 2024 storm in Victoria.
Type
Cost pass throughs
Status
Open
Roma to Brisbane Pipeline - 2025–26 tariff variation notice
APA Group has proposed new network prices to apply to its Queensland gas pipeline (transmission) for 2025–26.
Type
Tariff variations
Status
Open
AusNet Services – Cost Pass Through – Easement Land Tax 2025-26
The AER has approved AusNet Services' application for a positive pass through of easement land tax to be recovered in 2025-26.
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - 2025 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2025 - 31 December 2025.
Type
Tariff variations
Status
Current
Powerlink - Network support pass through 2022–23
Powerlink - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
Roma to Brisbane Pipeline - 2024–25 tariff variation notice
Roma to Brisbane proposed new network prices to apply to its Qld gas pipeline for 2024–25.
Type
Tariff variations
Status
Current
AusNet Services - Cost pass through - Easement land tax 2024–25
AusNet Services - Cost pass through - Easement land tax 2024–25
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - Annual tariff variation 2024
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2024 - 31 December 2024.
Type
Tariff variations
Status
Current
Victoria to NSW Interconnector West (VNI West) RIT-T dispute
On 16 October 2023 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2023–24
APA Group submitted to the AER an annual tariff variation notice for its Queensland gas transmission network for the period 1 July 2023 to 30 June 2024.
Type
Tariff variations
Status
Historical