Results
61 result(s), displaying 1 to 12
TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Roma to Brisbane Pipeline - 2025–26 tariff variation notice
APA Group has proposed new network prices to apply to its Queensland gas pipeline (transmission) for 2025–26.
Type
Tariff variations
Status
Open
TasNetworks North West Transmission Developments Stage 1 – Early Works Contingent Project
On 10 October 2024, TasNetworks submitted its contingent project application seeking to increase its revenue to fund early works on NWTD stage 1 early works.
Type
Contingent projects
Status
Open
TasNetworks - Network support pass through 2022-23
TasNetworks - Network support pass through 2022-23
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2022–23
Powerlink - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Roma to Brisbane Pipeline - 2024–25 tariff variation notice
Roma to Brisbane proposed new network prices to apply to its Qld gas pipeline for 2024–25.
Type
Tariff variations
Status
Current
Roma to Brisbane Pipeline - Annual tariff variation 2023–24
APA Group submitted to the AER an annual tariff variation notice for its Queensland gas transmission network for the period 1 July 2023 to 30 June 2024.
Type
Tariff variations
Status
Historical