Results
59 result(s), displaying 13 to 24
Multinet - 2024–25 tariff variation notice
Multinet proposed new network prices to apply to its Victorian gas network for 2024–25.
Type
Tariff variations
Status
Current
AusNet Services - 2024–25 tariff variation notice
AusNet Services proposed new network prices to apply to its Victorian gas network for 2024–25.
Type
Tariff variations
Status
Current
Australian Gas Networks (Victoria & Albury) - 2024–25 tariff variation notice
AGN proposed new network prices to apply to its Victorian gas network for 2024–25.
Type
Tariff variations
Status
Current
AusNet Services - Cost pass through - Easement land tax 2024–25
AusNet Services - Cost pass through - Easement land tax 2024–25
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - Annual tariff variation 2024
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2024 - 31 December 2024.
Type
Tariff variations
Status
Current
Powercor - Cost pass through - Increase to minimum wood pole interventions
Type
Cost pass throughs
Status
Current
AusNet Services - Cost pass through - Easement land tax 2023–24
Type
Cost pass throughs
Status
Current
Powercor - Ring-fencing waiver (streamlined process) - October 2022
Type
Ring-fencing
Status
Current
AusNet Services - Cost pass through - Easement land tax 2022–23
Type
Cost pass throughs
Status
Current
AusNet Services - Cost pass through - 2019–20 bushfire natural disaster
Type
Cost pass throughs
Status
Current
CitiPower, Powercor, United Energy - Cost Allocation Method 2020
Type
Cost allocation methods
Status
Current