Results
55 result(s), displaying 1 to 12
Kurri Kurri Lateral Pipeline classification decision
On 16 May 2025, we published the final decision for to classify the Kurri Kurri Lateral Pipeline (KKLP) classification.
Type
Determinations
Status
Current
Main Central-West Orana Renewable Energy Zone network project (contestable)
Read our determination on the amounts to be paid to ACEREZ for the main Central-West Orana REZ network project.
Type
Determinations
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
Transgrid - Determination 2023–28
Transgrid's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
Murraylink - Determination 2023–28
Murraylink's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
ElectraNet - Determination 2023–28
ElectraNet's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
Marinus Link - Determination 2025-28 - Stage 1, Part A (Early works)
The AER’s role is to review the reasonableness of the proposed costs of the Marinus Link interconnector to ensure consumers pay no more than necessary.
Type
Determinations
Status
Open
TransGrid - Determination 2018-23
Transgrid's electricity transmission determination for the period 1 July 2018 to 30 June 2023
Type
Determinations
Status
Historical