Results
218 result(s), displaying 1 to 12
Evoenergy - 2025–26 tariff variation notice
Evoenergy has proposed new network prices to apply to its ACT, Queanbeyan and Palerang gas network for 2025–26.
Type
Tariff variations
Status
Open
Australian Gas Networks (SA) - 2025–26 tariff variation notice
AGN has proposed new network prices to apply to its SA gas network for 2025-26.
Type
Tariff variations
Status
Open
AusNet Services - 2025–26 tariff variation notice
AusNet Services has proposed new network prices to apply to its Victorian gas network for 2025–26.
Type
Tariff variations
Status
Open
Australian Gas Networks (Victoria) - 2025–26 tariff variation notice
AGN has proposed new network prices to apply to its Victorian gas network for 2025–26.
Type
Tariff variations
Status
Open
Multinet - 2025–26 tariff variation notice
Multinet has proposed new network prices to apply to its Victorian gas network for 2025–26.
Type
Tariff variations
Status
Open
Amadeus Gas Pipeline - 2025–26 tariff variation notice
APA Group has proposed new network prices to apply to its Northern Territory gas pipeline for 2025–26.
Type
Tariff variations
Status
Open
Roma to Brisbane Pipeline - 2025–26 tariff variation notice
APA Group has proposed new network prices to apply to its Queensland gas pipeline (transmission) for 2025–26.
Type
Tariff variations
Status
Open
Kurri Kurri Lateral Pipeline classification decision
On 16 May 2025, we published the final decision for to classify the Kurri Kurri Lateral Pipeline (KKLP) classification.
Type
Determinations
Status
Current
Energex - Determination 2025–30
Energex electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Open
APA Victorian Transmission System - 2025 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2025 - 31 December 2025.
Type
Tariff variations
Status
Current
Main Central-West Orana Renewable Energy Zone network project (contestable)
Read our determination on the amounts to be paid to ACEREZ for the main Central-West Orana REZ network project.
Type
Determinations
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current