Results
3 result(s), displaying 1 to 3
Review of the AER exemptions framework for embedded networks
The AER is undertaking a Review of the AER exemptions framework for embedded networks.
Type
Reviews
Status
Open
Atlas to Reedy Creek Pipeline classification decision
On 10 February 2025, ARC Pipeline Pty Ltd applied for a classification decision for its Atlas to Reedy Creek Pipeline (ARCP).
Type
Determinations
Status
Open
Ausgrid’s distribution cost pass through application – January 2025 storm
Ausgrid submitted a cost pass through application to recover costs incurred due to a severe storm event from 15–17 January 2025. Submissions close 18 July 2025.
Type
Cost pass throughs
Status
Open