Results
48 result(s), displaying 1 to 12
Rate of Return Instrument 2026
The Rate of Return Instrument specifies how the AER will determine the allowed rate of return on capital invested in regulated electricity and gas networks.
Type
Guidelines
Status
Open
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
AusNet Services transmission cost pass through - 13 February 2024 storm
AusNet Services submitted a cost pass through application seeking to recover the costs it has incurred as a result of the 13 February 2024 storm in Victoria.
Type
Cost pass throughs
Status
Open
AusNet Services - 2025–26 pricing proposal
AusNet Services proposed new network prices to apply to its Victorian network for 2025–26.
Type
Pricing proposals
Status
Open
AusNet Services - 2025–26 tariff variation notice
AusNet Services has proposed new network prices to apply to its Victorian gas network for 2025–26.
Type
Tariff variations
Status
Open
Australian Gas Networks (Victoria) - 2025–26 tariff variation notice
AGN has proposed new network prices to apply to its Victorian gas network for 2025–26.
Type
Tariff variations
Status
Open
Multinet - 2025–26 tariff variation notice
Multinet has proposed new network prices to apply to its Victorian gas network for 2025–26.
Type
Tariff variations
Status
Open
CitiPower - 2025–26 pricing proposal
CitiPower proposed new network prices to apply to its Victorian network for 2025–26.
Type
Pricing proposals
Status
Open
Jemena - 2025–26 pricing proposal
Jemena proposed new network prices to apply to its Victorian network for 2025–26.
Type
Pricing proposals
Status
Open
Powercor - 2025–26 pricing proposal
Powercor proposed new network prices to apply to its Victorian network for 2025–26.
Type
Pricing proposals
Status
Open