Results
550 result(s), displaying 205 to 216
Trial projects guidelines - Regulatory sandboxing
Access guidance on how the AER will assess trial waiver applications and carry out our other functions in relation to trial projects.
Type
Guidelines
Status
Current
Customer Engagement Toolkit
The customer engagement toolkit provides guidance, support and resources to energy businesses to identify and support consumers experiencing vulnerability.
Type
Guidelines
Status
Current
Valuing emissions reduction final guidance - May 2024
Our guidance on applying a value of emissions reduction.
Type
Guidelines
Status
Current
Pricing methodology guidelines 2025 - Flexibility in allocating interconnector costs
Proposed transmission pricing methodology guidelines and information templates following AEMC's rule change on interconnector costs
Type
Guidelines
Status
Open
Review of electricity transmission service standards incentive schemes
The AER has reviewed aspects of the service target performance incentive scheme (STPIS) for transmission network service providers
Type
Reviews
Status
Current
Origin Retailer of Last Resort Cost Recovery Applications
The AER has approved Origin Energy's six cost recovery applications for costs incurred as the Retailer of Last Resort for retailer failures in 2022.
Type
Cost pass throughs
Status
Current
Transgrid HumeLink contingent project stage 2
Transgrid HumeLink contingent project stage 2
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
TasNetworks - Network support pass through 2022-23
TasNetworks - Network support pass through 2022-23
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2022–23
ElectraNet - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2022–23
Powerlink - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current