Results
280 result(s), displaying 85 to 96
Value of Network Resilience 2024
The AER undertook a review on the Value of Network Resilience to address electricity supply outages lasting longer than 12 hours (prolonged outages).
Type
Reviews
Status
Current
Gas ring-fencing decision guide
This guideline sets out the requirements for pipeline operators and how the AER will make decisions in relation to gas ring-fencing applications.
Type
Guidelines
Status
Current
Guidance on the efficient management of system strength framework
The AER has developed guidance intended to help System Strength Service Providers navigate the Efficient management of system strength on the power system rule.
Type
Guidelines
Status
Current
Values of Customer Reliability 2024
VCR play an important role in the identifying the right level of reliability investment, ensuring customers pay no more than necessary for reliable energy.
Type
Reviews
Status
Current
Connection assets
The NER require the AER to publish a register of existing dedicated networks assets and the identity of designated network asset owners.
Type
Reviews
Status
Current
Trial projects guidelines - Regulatory sandboxing
Access guidance on how the AER will assess trial waiver applications and carry out our other functions in relation to trial projects.
Type
Guidelines
Status
Current
Valuing emissions reduction final guidance - May 2024
Our guidance on applying a value of emissions reduction.
Type
Guidelines
Status
Current
Review of electricity transmission service standards incentive schemes
The AER has reviewed aspects of the service target performance incentive scheme (STPIS) for transmission network service providers
Type
Reviews
Status
Current
Transgrid HumeLink contingent project stage 2
Transgrid HumeLink contingent project stage 2
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
TasNetworks - Network support pass through 2022-23
TasNetworks - Network support pass through 2022-23
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2022–23
ElectraNet - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current