Use the drop-down filter to search by keyword, sector, segment, type of report and date completed.
Results
13 result(s), displaying 1 to 12
NSW contribution determination guideline (2022) - Superseded
The Contribution determination guideline (the Guideline) addresses cost recovery under the NSW Electricity Infrastructure Roadmap.
Type
Guidelines
Status
Historical
Expenditure forecast assessment guideline - Regulatory information notices for category analysis 2014
The Guideline specifies the information we require to assess expenditure. The Guideline has been superseded by the Annual Information Order.
Type
Guidelines
Status
Historical
Expenditure forecast assessment guideline - Regulatory information notices for economic benchmarking 2014
The Guideline specifies the information we require to assess expenditure. The Guideline has been superseded by the Annual Information Order.
Type
Guidelines
Status
Historical
ActewAGL - Determination on whether a scheme is a jurisdictional scheme
Determination on whether the Energy Industry Levy, the Utilities Network Facilities Tax and the Feed-in Tariff (Large-scale) are jurisdictional schemes.
Type
Schemes
Status
Historical
Citipower and Powercor - Determination of reporting on jurisdictional schemes
Type
Schemes
Status
Historical
Endeavour Energy - Determination of reporting on jurisdictional schemes
Type
Schemes
Status
Historical
Energex - Determination on whether a scheme is a jurisdictional scheme 2011
Type
Schemes
Status
Historical