Use the drop-down filter to search by keyword, sector, segment, type of report and date completed.
Results
14 result(s), displaying 1 to 12
NSW contribution determination guideline (2022) - Superseded
The Contribution determination guideline (the Guideline) addresses cost recovery under the NSW Electricity Infrastructure Roadmap.
Type
Guidelines
Status
Historical
Victoria F-factor scheme results for the 2016–2020 period
Victoria F-factor scheme results for the 2016–2020 period
Type
Schemes
Status
Historical
Victoria F-factor scheme determination 2016-20
Victoria F-factor scheme determination 2016-20
Type
Schemes
Status
Historical
Victoria F-factor amount determinations for 2014
Victoria F-factor amount determinations for 2014
Type
Schemes
Status
Historical
ActewAGL - Determination on whether a scheme is a jurisdictional scheme
Determination on whether the Energy Industry Levy, the Utilities Network Facilities Tax and the Feed-in Tariff (Large-scale) are jurisdictional schemes.
Type
Schemes
Status
Historical
Citipower and Powercor - Determination of reporting on jurisdictional schemes
Type
Schemes
Status
Historical