Use the drop-down filter to search by keyword, sector, segment, type of report and date completed.
Results
15 result(s), displaying 1 to 12
Rate of Return Instrument 2026
The Rate of Return Instrument specifies how the AER will determine the allowed rate of return on capital invested in regulated electricity and gas networks.
Type
Guidelines
Status
Open
Service target performance incentive scheme V6
The STPIS is to provide incentives to TNSPs to improve or maintain a high level of service for the benefit of participants in the NEM.
Type
Schemes
Status
Current
Electricity transmission post-tax revenue model - March 2025 amendment
The AER has released proposed amendments to its electricity transmission post-tax revenue model.
Type
Models
Status
Current
Day ahead auction record keeping guideline 2023
How transportation facility operators should record and maintain nomination and renomination data relevant to the AER’s monitoring functions.
Type
Guidelines
Status
Current
Annual benchmarking reports 2021
We examine the relative efficiency of the distribution and transmission electricity network service providers in 2021.
Type
Reviews
Status
Historical
Rate of return and cashflows in a low interest rate environment - Pathway to Rate of Return 2022
This is the fifth topic in a series of working papers that we will produce as part of our pathway to the 2022 Rate of Return instrument. The outcomes from these working papers will feed in to the active phase of our 2022 Rate of Return instrument review.
Type
Reviews
Status
Open
Insurance coverage pass through event – Guidance note
The AER has released its final guidance note on the insurance coverage pass through event.
Type
Guidelines
Status
Current
Electricity post-tax revenue models (transmission and distribution) - April 2021 amendment
Type
Models
Status
Current