Use the drop-down filter to search by keyword, sector, segment, type of report and date completed.
Results
20 result(s), displaying 1 to 12
Revenue determination guideline for NSW non-contestable projects
Our guideline explains the Transmission Efficiency Test and how we determine revenue for network operators authorised to carry out non-contestable projects.
Type
Guidelines
Status
Historical
NSW contribution determination guideline (2022) - Superseded
The Contribution determination guideline (the Guideline) addresses cost recovery under the NSW Electricity Infrastructure Roadmap.
Type
Guidelines
Status
Historical
Essential Energy - Proposed demand management and embedded generation connection incentive scheme
Type
Schemes
Status
Historical
Endeavour Energy - Proposed demand management and embedded generation connection incentive scheme
Type
Schemes
Status
Historical
Ausgrid - Proposed demand management and embedded generation connection incentive scheme
Type
Schemes
Status
Historical
ActewAGL - Proposed demand management and embedded generation connection incentive scheme
Type
Schemes
Status
Historical