Use the drop-down filter to search by keyword, sector, segment, type of report and date completed.
Results
8 result(s), displaying 1 to 8
Capital Expenditure Guideline Review 2025
We are undertaking a consultative process for amending the Capital Expenditure Incentive Guideline.
Type
Reviews
Status
Current
Information guideline 2015
On 27 March 2025, the Australian Energy Market Commission (AEMC) made a rule change removing the requirement to publish transmission information guidelines.
Type
Guidelines
Status
Historical
Post-tax revenue models (transmission and distribution) - January 2015 amendment
Type
Models
Status
Historical
Annual Benchmarking Report 2014
We examine the relative efficiency of the distribution and transmission electricity network service providers in 2014.
Type
Reviews
Status
Historical
Service target performance incentive scheme version 4.1 - September 2014 amendment
Type
Schemes
Status
Historical
Pricing methodology guidelines 2025 - Flexibility in allocating interconnector costs
Proposed transmission pricing methodology guidelines and information templates following AEMC's rule change on interconnector costs
Type
Guidelines
Status
Open
Rate of Return Instrument 2026
The Rate of Return Instrument specifies how the AER will determine the allowed rate of return on capital invested in regulated electricity and gas networks.
Type
Guidelines
Status
Open