Use the drop-down filter to search by keyword, sector, segment, type of report and date completed.
Results
5 result(s), displaying 1 to 5
NSW contribution determination guideline (2023) - Superseded
Our guideline explains how we determine the annual costs of the NSW electricity infrastructure roadmap that will then be recovered from consumers.
Type
Guidelines
Status
Historical
Amending the Post Tax Revenue Model in NSW roadmap determinations - Guidance note 2023
Learn how the National Electricity Rules' Post-Tax Revenue Model can be amended for non-contestable revenue determinations within the NSW infrastructure roadmap
Type
Guidelines
Status
Historical
Revenue determination guideline for NSW non-contestable projects
Our guideline explains the Transmission Efficiency Test and how we determine revenue for network operators authorised to carry out non-contestable projects.
Type
Guidelines
Status
Historical
NSW contribution determination guideline (2022) - Superseded
The Contribution determination guideline (the Guideline) addresses cost recovery under the NSW Electricity Infrastructure Roadmap.
Type
Guidelines
Status
Historical