12 result(s), displaying 1 to 12
Capital Expenditure Guideline Review 2025
We are undertaking a consultative process for amending the Capital Expenditure Incentive Guideline.
Type
Reviews
Status
Current
Networks information requirements review
The Networks Information Requirements Review is about driving improvements in the quality of the information about regulated networks that we use and share.
Type
Reviews
Status
Current
Revenue determination guideline for NSW non-contestable projects
Our guideline explains the Transmission Efficiency Test and how we determine revenue for network operators authorised to carry out non-contestable projects.
Type
Guidelines
Status
Historical
NSW contribution determination guideline (2022) - Superseded
The Contribution determination guideline (the Guideline) addresses cost recovery under the NSW Electricity Infrastructure Roadmap.
Type
Guidelines
Status
Historical
NSW Electricity Infrastructure Investment Act - 2nd jurisdictional scheme application
On 29 July 2022, the NSW Office of Energy and Climate Change (OECC) lodged an application for the AER to consider whether the scheme established under section 58(6) of the Electricity Infrastructure Investment Act 2020 (NSW) and clause 37 of the Electricity Infrastructure Investment Regulation 2021 is a jurisdictional scheme.
Type
Schemes
Status
Current
Revenue determination guideline for NSW contestable projects
Our guideline explains the Transmission Efficiency Test and how we determine revenue for network operators selected for projects through a competitive process.
Type
Guidelines
Status
Current
Pricing methodology guidelines 2025 - Flexibility in allocating interconnector costs
Proposed transmission pricing methodology guidelines and information templates following AEMC's rule change on interconnector costs
Type
Guidelines
Status
Open
Rate of Return Instrument 2026
The Rate of Return Instrument specifies how the AER will determine the allowed rate of return on capital invested in regulated electricity and gas networks.
Type
Guidelines
Status
Open