Use the drop-down filter to search by keyword, sector, segment, type of report and date completed.
Results
19 result(s), displaying 13 to 19
Valuing emissions reduction final guidance - May 2024
Our guidance on applying a value of emissions reduction.
Type
Guidelines
Status
Open
Pricing methodology guidelines 2025 - Flexibility in allocating interconnector costs
Proposed transmission pricing methodology guidelines and information templates following AEMC's rule change on interconnector costs
Type
Guidelines
Status
Open
Rate of Return Instrument 2026
The Rate of Return Instrument specifies how the AER will determine the allowed rate of return on capital invested in regulated electricity and gas networks.
Type
Guidelines
Status
Open