Use the search bar to do a keyword search on an open consultation.
Results
21 result(s), displaying 13 to 21
APA Victorian Transmission System - Rule 80 application for the expansion of the South West Pipeline
APA submitted an application under rule 80 of the NGR seeking an advanced determination for its capital expenditure for the Victorian Transmission System (VTS).
Type
Access arrangements
Status
Open
APA Victorian Transmission System - Access arrangement 2028–32
Gas access arrangement for APA Victorian Transmission System for the 2028–32 regulatory period
Type
Access arrangements
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
AusNet Services Transmission - Determination 2027-32
On 31 October 2025, AusNet Services submitted its transmission revenue proposal to the AER for the 2027–32 regulatory period.
Type
Determinations
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN (SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Victorian DNSPs – Cost pass through applications – Flexible trading arrangements rule change
Applications are to recover costs incurred due to the flexible trading arrangements rule change. Submissions close 23 January 2026.
Type
Cost pass throughs
Status
Open
Jemena – Cost pass through applications – MITE, ASMD, VEBM2
Jemena submitted applications to recover costs incurred due to various regulatory and service standard change events. Submissions close 23 January 2026.
Type
Cost pass throughs
Status
Open
Energex - Cost pass through application – Tropical Cyclone Alfred
Energex submitted a cost pass through application to recover costs incurred due to Tropical Cyclone Alfred in March 2025. Submissions close 23 January 2026.
Type
Cost pass throughs
Status
Open