Results
20 result(s), displaying 1 to 12
Amadeus Gas Pipeline - 2025–26 tariff variation notice
APA Group has proposed new network prices to apply to its Northern Territory gas pipeline for 2025–26.
Type
Tariff variations
Status
Open
Roma to Brisbane Pipeline - 2025–26 tariff variation notice
APA Group has proposed new network prices to apply to its Queensland gas pipeline (transmission) for 2025–26.
Type
Tariff variations
Status
Open
ElectraNet Mid North South Australia REZ Expansion Stage 1a - Early Works Contingent Project
On 20 June 2025, the AER published its decision on ElectraNet's Mid North South Australia REZ Expansion Stage 1a early works contingent project application.
Type
Contingent projects
Status
Current
Transgrid - Ring-fencing waiver - Telecommunications services - April 2025
On 17 April 2025, the AER granted Transgrid a waiver to provide telecommunication services
Type
Ring-fencing
Status
Current
AusNet Services – Cost Pass Through – Easement Land Tax 2025-26
The AER has approved AusNet Services' application for a positive pass through of easement land tax to be recovered in 2025-26.
Type
Cost pass throughs
Status
Current
TransGrid - Cost allocation method 2017
Transgrid's Cost Allocation Method (2017) was superceeded in May 2023.
Type
Cost allocation methods
Status
Historical
APA VTS (formerly APA GasNet) - Annual tariff variation 2017
Type
Tariff variations
Status
Historical
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2016-17
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - easement land tax 2016
Type
Cost pass throughs
Status
Historical
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2017-22
Type
Access arrangements
Status
Historical