Results
17 result(s), displaying 1 to 12
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
AusNet Services transmission cost pass through - 13 February 2024 storm
AusNet Services submitted a cost pass through application seeking to recover the costs it has incurred as a result of the 13 February 2024 storm in Victoria.
Type
Cost pass throughs
Status
Open
TasNetworks North West Transmission Developments Stage 1 – Early Works Contingent Project
On 10 October 2024, TasNetworks submitted its contingent project application seeking to increase its revenue to fund early works on NWTD stage 1 early works.
Type
Contingent projects
Status
Open
Transgrid - Ring-fencing waiver (backup generation) - January 2024
Transgrid submitted a ring-fencing waiver application under clause 5.2 of the Electricity Transmission Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
Powercor - Contingent project - installation of Rapid Earth Fault Current Limiters - tranche 3
Type
Contingent projects
Status
Open
Victoria: December 2026 - February 2027
The Retailer Reliability Obligation (RRO) is designed to support reliability in the National Electricity Market (NEM).
Type
Retail Reliability Obligation
Status
Open
SA Power Networks - Ring fencing waiver - Market Active Solar Trial - January 2024
SA Power Networks has submitted a waiver application under provision 4.2 of the Ring-fencing Guideline (Electricity distribution)
Type
Ring-fencing
Status
Open
AusNet Services - Access Arrangement 2023–28 - Variation proposal
On 30 September 2024, AusNet Gas Services (AusNet) submitted a variation proposal for its 2023–28 gas access arrangement.
Type
Access arrangements
Status
Open
CitiPower, Powercor, and United Energy - Ring-fencing waiver - Electric vehicle charging infrastructure
The AER invites stakeholders to provide feedback on CPU’s application for a waiver from the Ringfencing guideline (electricity distribution) to provide EVCI.
Type
Ring-fencing
Status
Open