ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2022–23
ElectraNet - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
SA Power Networks - Cost pass through - 2022-23 River Murray flood event
On 24 March 2024, the AER published its decision on a cost pass through application from SA Power Networks, seeking to recover costs incurred responding to the 2022-23 River Murray flood event.
Type
Cost pass throughs
Status
Current
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current
SA Power Networks - 2024–25 pricing proposal
SA Power Networks proposed new network prices to apply to its South Australian network for 2024–25.
Type
Pricing proposals
Status
Current
Australian Gas Networks (SA) - 2024–25 tariff variation notice
AGN proposed new network prices to apply to its SA gas network for 2024–25.
Type
Tariff variations
Status
Current
SA Power Networks - Annual pricing 2023–24
SA Power Networks submitted to the AER an annual pricing proposal for its South Australian distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
Australian Gas Networks (SA) - Annual tariff variation 2023–24
Australian Gas Networks submitted to the AER an annual tariff variation notice for its South Australian gas distribution network for the period 1 July 2023 to 3
Type
Tariff variations
Status
Historical
Murraylink - Determination 2023–28
Murraylink's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
ElectraNet - Determination 2023–28
ElectraNet's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
South Australia: January - March 2026
On 5 January 2023, the South Australia Minister for Energy and Mining triggered the RRO in South Australia for the first quarter of 2026.
Type
Retail Reliability Obligation
Status
Revoked