Results
13 result(s), displaying 1 to 12
ElectraNet - Network support pass through 2022–23
ElectraNet - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
SA Power Networks - Cost pass through - 2022-23 River Murray flood event
On 24 March 2024, the AER published its decision on a cost pass through application from SA Power Networks, seeking to recover costs incurred responding to the 2022-23 River Murray flood event.
Type
Cost pass throughs
Status
Current
SA Power Networks - Annual pricing 2023–24
SA Power Networks submitted to the AER an annual pricing proposal for its South Australian distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
Australian Gas Networks (SA) - Annual tariff variation 2023–24
Australian Gas Networks submitted to the AER an annual tariff variation notice for its South Australian gas distribution network for the period 1 July 2023 to 3
Type
Tariff variations
Status
Historical
Murraylink - Determination 2023–28
Murraylink's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
ElectraNet - Determination 2023–28
ElectraNet's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
South Australia: January - March 2025
The Retailer Reliability Obligation (RRO) is designed to support reliability in the National Electricity Market (NEM).
Type
Retail Reliability Obligation
Status
Revoked
South Australia: January - March 2026
On 5 January 2023, the South Australia Minister for Energy and Mining triggered the RRO in South Australia for the first quarter of 2026.
Type
Retail Reliability Obligation
Status
Revoked
South Australia: January - March 2028
On 2 January 2025, the South Australia Minister for Energy and Mining triggered the RRO in South Australia for the first quarter of 2028.
Type
Retail Reliability Obligation
Status
Open
Ring-fencing guideline (electricity transmission) 2025
The AER has released version 5 of the ring-fencing guideline for electricity transmission.
Type
Ring-fencing
Status
Current
Ring-fencing guideline (electricity distribution) 2025
The AER has released version 4 of the ring-fencing guideline for electricity distribution.
Type
Ring-fencing
Status
Current
ElectraNet Mid North South Australia REZ Expansion Stage 1a - Early Works Contingent Project
On 28 March 2025, ElectraNet submitted its Mid North South Australia Renewable Energy Zone Expansion Stage 1a contingent project application to the AER.
Type
Contingent projects
Status
Open