Results
13 result(s), displaying 1 to 12
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Cost pass through - 2024–25 Inertia network service costs
On 22 March 2024, the AER published its decision on a negative inertia shortfall cost pass through application from ElectraNet.
Type
Cost pass throughs
Status
Current
SA Power Networks - 2024–25 pricing proposal
SA Power Networks proposed new network prices to apply to its South Australian network for 2024–25.
Type
Pricing proposals
Status
Current
Australian Gas Networks (SA) - 2024–25 tariff variation notice
AGN proposed new network prices to apply to its SA gas network for 2024–25.
Type
Tariff variations
Status
Current
South Australia: January - March 2025
The Retailer Reliability Obligation (RRO) is designed to support reliability in the National Electricity Market (NEM).
Type
Retail Reliability Obligation
Status
Revoked
SA Power Networks - Ring fencing waiver - Market Active Solar Trial - January 2024
SA Power Networks has submitted a waiver application under provision 4.2 of the Ring-fencing Guideline (Electricity distribution)
Type
Ring-fencing
Status
Open
South Australia: January - March 2028
On 2 January 2025, the South Australia Minister for Energy and Mining triggered the RRO in South Australia for the first quarter of 2028.
Type
Retail Reliability Obligation
Status
Open
Ring-fencing guideline (electricity transmission) 2025
The AER has released version 5 of the ring-fencing guideline for electricity transmission.
Type
Ring-fencing
Status
Current
Ring-fencing guideline (electricity distribution) 2025
The AER has released version 4 of the ring-fencing guideline for electricity distribution.
Type
Ring-fencing
Status
Current
ElectraNet Mid North South Australia REZ Expansion Stage 1a - Early Works Contingent Project
On 28 March 2025, ElectraNet submitted its Mid North South Australia Renewable Energy Zone Expansion Stage 1a contingent project application to the AER.
Type
Contingent projects
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current