Results
10 result(s), displaying 1 to 10
SA Power Networks - Ring fencing waiver - Market Active Solar Trial - January 2024
SA Power Networks has submitted a waiver application under provision 4.2 of the Ring-fencing Guideline (Electricity distribution)
Type
Ring-fencing
Status
Open
Essential Energy Bushfire Risk Reclassification Contingent Project
The AER's decision relating to Essential Energy's Bushfire Risk Reclassification Contingent Project
Type
Contingent projects
Status
Open
CitiPower, Powercor, and United Energy - Ring-fencing waiver - Electric vehicle charging infrastructure
The AER invites stakeholders to provide feedback on CPU’s application for a waiver from the Ringfencing guideline (electricity distribution) to provide EVCI.
Type
Ring-fencing
Status
Open
AusNet Services - Access Arrangement 2023–28 - Variation proposal
On 30 September 2024, AusNet Gas Services (AusNet) submitted a variation proposal for its 2023–28 gas access arrangement.
Type
Access arrangements
Status
Open
Kurri Kurri Lateral Pipeline classification decision
On 6 December 2024, APA Group (APA) applied for a classification decision for its Kurri Kurri Lateral Pipeline (KKPL).
Type
Determinations
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
United Energy VEBM cost pass through application
United Energy’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open