Results
13 result(s), displaying 1 to 12
Sydney CBD RIT-D dispute
On 25 October 2018 the AER published a determination clause 5.17.5 of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Jemena Gas Networks (NSW) - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical
Central Ranges Gas Network (distribution) - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical
Central Ranges Gas Pipeline (transmission) - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical
Australian Gas Networks (Albury) - Annual tariff variation 2018
Type
Tariff variations
Status
Historical
NSW Electricity Infrastructure Roadmap - contribution determination 2025−26
View our decision on the maximum amount electricity distributors can pass through to consumers in 2025-26 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Ausgrid - 2025–26 pricing proposal
Ausgrid proposed new network prices to apply to its New South Wales network for 2025–26.
Type
Pricing proposals
Status
Open
Endeavour Energy - 2025–26 pricing proposal
Endeavour Energy proposed new network prices to apply to its New South Wales network for 2025–26.
Type
Pricing proposals
Status
Open