Results
18 result(s), displaying 1 to 12
AusNet Services – Cost Pass Through – Easement Land Tax 2025-26
The AER has approved AusNet Services' application for a positive pass through of easement land tax to be recovered in 2025-26.
Type
Cost pass throughs
Status
Current
APA Victorian Transmission System - 2025 tariff variation notice
APA Victorian Transmission System submitted to the AER an annual tariff variation notice for the period 1 January 2025 - 31 December 2025.
Type
Tariff variations
Status
Open
Roma to Brisbane Pipeline - Annual tariff variation 2020-21
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - Easement land tax 2020–21
Type
Cost pass throughs
Status
Current
TransGrid - Expanding NSW-QLD Transmission Transfer Capacity regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Current
ElectraNet - SA Energy Transformation regulatory investment test for transmission (RIT-T)
Type
Contingent projects
Status
Current
TasNetworks - Cost pass through - extension of time to submit application
Type
Cost pass throughs
Status
Current
APA Victorian Gas Transmission System - Annual tariff variation 2020
Type
Tariff variations
Status
Historical
AusNet Services (Transmission) - Cost allocation method 2019
Type
Cost allocation methods
Status
Current