Results
74 result(s), displaying 1 to 12
Amadeus Gas Pipeline - 2025–26 tariff variation notice
APA Group has proposed new network prices to apply to its Northern Territory gas pipeline for 2025–26.
Type
Tariff variations
Status
Open
Kurri Kurri Lateral Pipeline classification decision
On 16 May 2025, we published the final decision for to classify the Kurri Kurri Lateral Pipeline (KKLP) classification.
Type
Determinations
Status
Current
Transgrid - Ring-fencing waiver - Telecommunications services - April 2025
On 17 April 2025, the AER granted Transgrid a waiver to provide telecommunication services
Type
Ring-fencing
Status
Current
Main Central-West Orana Renewable Energy Zone network project (contestable)
Read our determination on the amounts to be paid to ACEREZ for the main Central-West Orana REZ network project.
Type
Determinations
Status
Current
Power and Water Corporation - Ring Fencing Decision - McArthur River Mining Pipeline
The AER has made a final decision to grant an exemption to Power and Water from their ring-fencing obligations for the McArthur River Mining Pipeline.
Type
Ring-fencing
Status
Current
Transgrid HumeLink contingent project stage 2
Transgrid HumeLink contingent project stage 2
Type
Contingent projects
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
Amadeus Gas Pipeline - 2024–25 tariff variation notice
Amadeus proposed new network prices to apply to its NT gas pipeline for 2024–25.
Type
Tariff variations
Status
Current
Transgrid VNI West contingent project application stage 1 early works
Transgrid Victoria to NSW Interconnector West (VNI West) contingent project application stage 1 early works
Type
Contingent projects
Status
Current
Transgrid - Ring-fencing waiver - Telecommunications services - April 2024
Transgrid seeking a waiver from transmission ring-fencing guideline to continue to own and operate 6 telecommunications services for a period of 12 months.
Type
Ring-fencing
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2024−25
View our decision on the maximum amount electricity distributors can pass through to consumers in 2024-25 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Transgrid - Ring-fencing waiver (backup generation) - January 2024
Transgrid submitted a ring-fencing waiver application under clause 5.2 of the Electricity Transmission Ring-fencing Guideline.
Type
Ring-fencing
Status
Open