Results
306 result(s), displaying 1 to 12
Rate of Return Instrument 2026
The Rate of Return Instrument specifies how the AER will determine the allowed rate of return on capital invested in regulated electricity and gas networks.
Type
Guidelines
Status
Open
TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current
AusNet Services transmission cost pass through - 13 February 2024 storm
AusNet Services submitted a cost pass through application seeking to recover the costs it has incurred as a result of the 13 February 2024 storm in Victoria.
Type
Cost pass throughs
Status
Open
Capital Expenditure Guideline Review 2025
We are undertaking a consultative process for amending the Capital Expenditure Incentive Guideline.
Type
Reviews
Status
Current
Service target performance incentive scheme V6
The STPIS is to provide incentives to TNSPs to improve or maintain a high level of service for the benefit of participants in the NEM.
Type
Schemes
Status
Current
Transgrid - Ring-fencing waiver - Telecommunications services - April 2025
On 17 April 2025, the AER granted Transgrid a waiver to provide telecommunication services
Type
Ring-fencing
Status
Current
Electricity transmission post-tax revenue model - March 2025 amendment
The AER has released proposed amendments to its electricity transmission post-tax revenue model.
Type
Models
Status
Current
AusNet Services – Cost Pass Through – Easement Land Tax 2025-26
The AER has approved AusNet Services' application for a positive pass through of easement land tax to be recovered in 2025-26.
Type
Cost pass throughs
Status
Current
2024 cost thresholds review for the regulatory investment test
On 12 November 2024, the AER published a final determination on the 2024 cost threshold review for regulatory investment tests and annual price reports.
Type
Reviews
Status
Current
System Security Network Support Payment Guideline
The Guideline assists TNSPs to better understand how they can apply for AER review of significant draft SSNS contracts.
Type
Guidelines
Status
Current