Results
93 result(s), displaying 49 to 60
Jemena Electricity Networks - Jurisidictional scheme application
Determination on whether the license scheme under section 21(a) of the Electricity Industry Act 2000 (Vic) is a jurisdictional scheme.
Type
Schemes
Status
Open
Pricing methodology guidelines 2025 - Flexibility in allocating interconnector costs
Proposed transmission pricing methodology guidelines and information templates following AEMC's rule change on interconnector costs
Type
Guidelines
Status
Open
Interim Contracts and Firmness Guidelines review 2025
The AER is reviewing the Retailer Reliability Obligation interim Contracts and Firmness Guidelines.
Type
Guidelines
Status
Open
Ergon Energy - Ring-fencing waiver - competitive services
On 25 July 2023, Ergon Energy submitted to the AER a ring-fencing waiver application from clauses 3.1(b) and 4.2.3 of the Ring-fencing Guideline (Electricity distribution).
Type
Ring-fencing
Status
Open
Essential Energy - Ring-fencing waiver - training services
Essential Energy submitted a ring-fencing waiver application under clause 5.2 of the Electricity Distribution Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
Transgrid - Ring-fencing waiver (backup generation) - January 2024
Transgrid submitted a ring-fencing waiver application under clause 5.2 of the Electricity Transmission Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
AusNet Services - Determination 2026–31
AusNet Services is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Open
CitiPower - Determination 2026–31
CitiPower is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Open
Jemena - Determination 2026–31
Jemena is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Open
Powercor - Determination 2026–31
Powercor is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Open
United Energy - Determination 2026–31
United Energy is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Open
AusNet Services - Cost pass through - October 2021 storm
On 22 June 2022, the AER released its determination on AusNet Services' October 2021 storm cost pass through application.
Type
Cost pass throughs
Status
Open