Use the drop-down filter to search by keyword, sector, segment, type of report and date completed.
Results
7 result(s), displaying 1 to 7
Rate of Return Instrument 2026
The Rate of Return Instrument specifies how the AER will determine the allowed rate of return on capital invested in regulated electricity and gas networks.
Type
Guidelines
Status
Open
Minimum disconnection amount – 2025 review
The AER is consulting on a new minimum disconnection amount for the National Energy Customer Framework, with submissions closing on Wednesday, 18 June 2025.
Type
Reviews
Status
Open
Compliance procedures and guidelines - 2024 update
We are reviewing our compliance procedures and guidelines. Submissions on the draft Guidelines are invited from interested stakeholders by 19 April 2024.
Type
Guidelines
Status
Open
Default market offer - Net system load profile approach
Exploring alternative options to produce the load profiles based on Net System Load Profile (NSLP) data for DMO 6.
Type
Reviews
Status
Open
Jemena Electricity Networks - Jurisidictional scheme application
Determination on whether the license scheme under section 21(a) of the Electricity Industry Act 2000 (Vic) is a jurisdictional scheme.
Type
Schemes
Status
Open
Pricing methodology guidelines 2025 - Flexibility in allocating interconnector costs
Proposed transmission pricing methodology guidelines and information templates following AEMC's rule change on interconnector costs
Type
Guidelines
Status
Open
Interim Contracts and Firmness Guidelines review 2025
The AER is reviewing the Retailer Reliability Obligation interim Contracts and Firmness Guidelines.
Type
Guidelines
Status
Open